首页> 外文期刊>VGB KraftwerksTechnik >Ecological aspects and construction involved in the building of hydro-power plants
【24h】

Ecological aspects and construction involved in the building of hydro-power plants

机译:水电厂建设涉及的生态方面和建设

获取原文
获取原文并翻译 | 示例
       

摘要

The phase plan for the Austrian Danube dating back to the fifties had already included a power plant phase in Vienna. The first project plans for the Freudenau power plant on the Danube were submitted to the Vienna authorities in 1985. A public survey was conducted in Vienna. Based on a 44 % participation of all those entitled to vote, a vote in favour of the Freudenan retaining capacity phase of more than 72 % was achieved. According to the ecologists improved river conditions will be achieved. Since the "new Danube" has been installed, only excellent water quality values have been recorded.
机译:可以追溯到五十年代的奥地利多瑙河的分阶段计划已经包括了维也纳的发电厂阶段。 1985年,多瑙河弗洛伊德瑙电厂的第一个项目计划已提交给维也纳当局。在维也纳进行了一次公开调查。在所有有权投票的人中,有44%的人参加了投票,投票结果表明Freudenan保留能力阶段的投票率超过72%。据生态学家称,将改善河流条件。由于安装了“新多瑙河”,因此仅记录到了出色的水质值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号