WORLD'S FIRST DAMLESS UNDERGROUND SEA HYDROPOWER PLANT KRISHNA'S PULLEY METHOD
展开▼
机译:世界上第一个完美的地下水力发电厂KRISHNA的滑轮方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
It is the world's first dam less underground sea hydropower plant to produceany amount of (MW) hydropower from SEA 24 hours a day 365 days a year. Itcomprises Turbine-Generators (11) to produce electricity and water tank (8) tocollect wastewater from Turbine draft tube (20). Syringe barrel (5) to collectthewastewater from the water tank (8) and Automatic Locomotives (15) diesel orsteam compound pulley (3) load (27) and hydraulic press (1) are used to pushthe Syringe piston (5) forward to compress the wastewater in the syringebarrel(5) to send it back to SEA (14) and to move the pulley load (27) up in thesyringebarrel and then to move back the syringe piston (6) for next operation. In mymethod SEA becomes a RESERVOIR and we can tap (produce) billions andbillions or perhaps trillions and trillions of stored energy (MW) in theentire sea(ocean). We do not need wave power tidal power wind power solar powerbiomass power geothermal power OTEC power osmotic power ITER power (builtin FRANCE) or any other power any more. We do not need oil coal uraniumthorium natural gas any more to produce electricity. My method to producecheap electricity will drive poverty from earth.
展开▼