首页> 外国专利> CONSTRUCTION TIME SELECTION DEVICE AND CONSTRUCTION TIME SELECTION METHOD

CONSTRUCTION TIME SELECTION DEVICE AND CONSTRUCTION TIME SELECTION METHOD

机译:施工时间选择装置及施工时间选择方法

摘要

An object is to select an appropriate timing for servicing a wind turbine generator (12). In a wind turbine generator system (10), a system managing device (20) determines a servicing timing for replacing or repairing a main component included in the wind turbine generator (12) due to a failure of the main component in accordance with a time point at which the main component may fail, which is predicted on the basis of a temporal change in a detection signal output from a status detector that detects the status of the main component. A servicing planning device (22) selects a servicing timing for the main component on the basis of a servicing suspension rate at which an average wind speed at a location where the wind turbine generator (12) is installed becomes higher than or equal to a predetermined threshold value at which servicing of the component is not possible, the timing being selected with reference to the determined timing.
机译:目的是选择用于维修风力涡轮发电机(12)的合适的正时。在风力涡轮发电机系统(10)中,系统管理装置(20)根据时间来确定由于主要部件的故障而用于更换或修理包括在风力涡轮发电机(12)中的主要部件的维修时机。根据从检测主要部件状态的状态检测器输出的检测信号的时间变化来预测主要部件可能失效的点。维修计划装置(22)基于维修悬挂率来选择主要部件的维修时刻,在该维修悬挂率下,风力发电机(12)的安装位置处的平均风速变得大于或等于预定值。该阈值是不可能进行组件维修的时间,该时间参考确定的时间来选择。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号