MODEL OF CONSTRUCTION SUBCONTRACTORS SELECTION WITH TIME WINDOWS FOR THEIR AVAILABILITY

机译:施工分包商的模型选择时间窗的可用性

获取原文
获取原文并翻译 | 示例
           

摘要

Most construction projects involve subcontracting some work packages. A subcontractor is employed on the basis of their bid as well as according to their availability. A viable schedule must account for resource availability constraints. These resources (e.g. crews, subcontractors) engage in many projects, so they become at the disposal for a new project only in certain periods. One of the key tasks of a planner is thus synchronizing the work of resources between concurrent projects. The paper presents a mathematical model of the problem of selecting subcontractors or general contractor's crews for a time-constrained project that accounts for the availability of contractors, as well as for the cost of subcontracting works. The proposed mixed integer-binary linear programming model enables the user to perform the time/cost trade-off analysis.
机译:大多数建筑项目涉及分包一些工作包。根据他们的出价和根据其可用性,使用分包商。可行的时间表必须考虑资源可用性约束。这些资源(例如工作人员,分包商)从事许多项目,因此他们只在某些时期内使用了一个新项目。因此,规划师的关键任务之一是同步并发项目之间的资源工作。本文提出了选择分包商或一般承包商船员的问题,用于减少承包商可用性的时间约束项目,以及分包工程的成本。所提出的混合整数 - 二进制线性编程模型使用户能够执行时间/成本折衷分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号