首页>
外国专利>
HYDROELECTRIC GENERATION PLAN ADJUSTMENT DEVICE, HYDROELECTRIC GENERATION PLAN ADJUSTMENT METHOD AND PROGRAM
HYDROELECTRIC GENERATION PLAN ADJUSTMENT DEVICE, HYDROELECTRIC GENERATION PLAN ADJUSTMENT METHOD AND PROGRAM
展开▼
机译:水力发电计划调整装置,水力发电计划调整方法及程序
展开▼
页面导航
摘要
著录项
相似文献
摘要
The economical load distribution adjusting device 10 acquires an optimal hydroelectric output, optimal demand, and unit power generation cost from the supply-demand planning device 23, acquires the planned hydroelectric output planned by the water level planning devices 21 by providing a price signal created by converting the unit power generation cost, and acquires a planned demand planned by the charge control devices 22 by similarly providing a price signal. The economical load distribution adjusting device 10 adjusts the power price of the time at which the planned hydroelectric output does not agree with the optimal output and makes the water level planning devices 21 replan the hydroelectric output by providing a price signal obtained by converting the adjusted power price, and adjusts the power price of the time at which the planned demand does not agree with the optimal demand and makes the charge control devices 22 replan the amount of demand by providing a price signal obtained by converting the adjusted power price.
展开▼