HYDROELECTRIC GENERATION PLAN ADJUSTMENT DEVICE, HYDROELECTRIC GENERATION PLAN ADJUSTMENT METHOD AND PROGRAM

机译:水力发电计划调整装置,水力发电计划调整方法及程序

摘要

The economical load distribution adjusting device 10 acquires an optimal hydroelectric output, optimal demand, and unit power generation cost from the supply-demand planning device 23, acquires the planned hydroelectric output planned by the water level planning devices 21 by providing a price signal created by converting the unit power generation cost, and acquires a planned demand planned by the charge control devices 22 by similarly providing a price signal. The economical load distribution adjusting device 10 adjusts the power price of the time at which the planned hydroelectric output does not agree with the optimal output and makes the water level planning devices 21 replan the hydroelectric output by providing a price signal obtained by converting the adjusted power price, and adjusts the power price of the time at which the planned demand does not agree with the optimal demand and makes the charge control devices 22 replan the amount of demand by providing a price signal obtained by converting the adjusted power price.
机译:经济的负荷分配调整装置10从供需计划装置23获取最佳的水力发电输出,最佳的需求和单位发电成本,并通过提供由水位计划装置21生成的价格信号来获取由水位计划装置21计划的计划的水力发电输出。转换单位发电成本,并且通过类似地提供价格信号来获取由充电控制装置22计划的计划需求。经济的负荷分配调整装置10调整计划的水力发电输出与最佳输出不一致的时间的电力价格,并通过提供通过转换调整后的电力而获得的价格信号,使水位计划装置21重新计划水力发电输出。价格,并调整计划需求与最佳需求不一致的时间的电价,并通过提供通过转换调整后的电价而获得的价格信号,使充电控制装置22重新计划需求量。

著录项

  • 公开/公告号EP2790147A4

    专利类型

  • 公开/公告日2015-08-05

    原文格式PDF

  • 申请/专利权人 THE CHUGOKU ELECTRIC POWER CO. INC.;

    申请/专利号EP20110876874

  • 发明设计人 OE RYUJI;

    申请日2011-12-06

  • 分类号G06Q50/06;G06Q50/12;

  • 国家 EP

  • 入库时间 2022-08-21 15:05:16