首页> 外国专利> NEW RAILWAY ROADBED LAYING METHOD FOR SIMULTANEOUSLY THREE THERMAL POWER CABLE

NEW RAILWAY ROADBED LAYING METHOD FOR SIMULTANEOUSLY THREE THERMAL POWER CABLE

机译:同时三热力电缆的铁路路基铺设新方法

摘要

The present invention relates to a method for simultaneously installing three line power cables for supplying power to be installed along a new railway roadbed and while moving continuously. More specifically, the method for simultaneously installing three line power cables for a new railway roadbed includes: a first preparation step of preparing a first drum, a second drum, and a third drum where a power cable is wound and a portable installation device for simultaneously installing three line power cables for a new railway roadbed capable of moving the first, the second, and the third drum; a second preparation step of moving the installation device where the first, the second, and the third drums are loaded into an installation space and placing a power cable onto a cable pipe on a railway roadbed; an installation step of pulling the power cable wound on the first, the second, and the third drums while moving the installation device along the railway roadbed; and an arrangement step of arranging the power cable onto the cable pipe when the power cable is installed. The installation method for simultaneously installing three line power cables for a new railway roadbed according to the present invention is able to reduce work preparation time since the first, second, and third drums are moved while being mounted on a vehicle and also is able to reduce work time since the installation of the power cable and the arrangement of the cable in the pipe are done at the same time. Furthermore, it is possible to prevent damage to the cable by putting down the power cable onto the cable pipe while the support roller of an installation vehicle and the installation vehicle itself are moving. In addition, the work costs can be reduced because the installation method requires less work time and workers than a conventional installation method using a winch. [Reference numerals] (S100) First preparation step; (S200) Second preparation step; (S300) Installation step; (S400) Arrangement step
机译:本发明涉及一种用于同时安装三根电力电缆的方法,该三根电力电缆用于提供电力,该电力将沿着新的铁路路基安装并连续移动。更具体地,用于为新的铁路路基同时安装三根电力电缆的方法包括:第一准备步骤,该第一准备步骤是缠绕电缆的第一鼓,第二鼓和第三鼓以及用于同时安装的便携式安装装置。为新的铁路路基安装三根电缆线,以移动第一,第二和第三鼓;第二准备步骤是将安装有第一,第二和第三鼓的安装装置移动到安装空间中,并将电力电缆放置在铁路路基的电缆管上。安装步骤是在沿着铁路路基移动安装设备的同时拉动缠绕在第一,第二和第三鼓上的电力电缆;安装步骤是在安装电源线时将电源线布置在电缆管上。根据本发明的用于同时安装新铁路路基的三线电力电缆的安装方法能够减少工作准备时间,因为第一,第二和第三鼓在安装于车辆时移动了,并且还能够减少由于电力电缆的安装和电缆在管道中的布置是同时进行的,因此需要同时进行工作。此外,可以通过在安装车辆的支撑辊和安装车辆自身移动的同时将电力电缆放到电缆管上来防止电缆损坏。另外,由于安装方法比使用绞盘的常规安装方法需要更少的工作时间和工人,因此可以降低工作成本。 [附图标记](S100)第一准备步骤; (S200)第二准备步骤; (S300)安装步骤; (S400)安排步骤

著录项

  • 公开/公告号KR101361065B1

    专利类型

  • 公开/公告日2014-02-07

    原文格式PDF

  • 申请/专利权人 SAMWOOTECH;

    申请/专利号KR20130149775

  • 发明设计人 LEE SI YEON;

    申请日2013-12-04

  • 分类号B65H54/26;B65H59/02;H02G1/06;

  • 国家 KR

  • 入库时间 2022-08-21 15:41:32

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号