首页> 外国专利> UPPER ROUTE BRIDGE FOR RAIL-CROSSING STRUCTURE CONSTRUCTION

UPPER ROUTE BRIDGE FOR RAIL-CROSSING STRUCTURE CONSTRUCTION

机译:跨铁路结构施工的上路线桥

摘要

The present invention provides a temporary upper bridge for constructing a traverse structure of a railroad which includes a plurality of support piles fixed on both sides of a construction section where the traverse structure in the lower part of the railroad is constructed by being individually driven into the ground in order to reduce impact and vibration and has excellent insulation properties; a pair of longitudinal girders supported on the upper end of the support piles and installed in the longitudinal direction of the railroad on both sides of the construction section; a plurality of traverse girders of which both ends are supported on the upper part of the longitudinal girder and which is installed in the longitudinal direction of the railroad at a fixed interval by crossing the lower part of the railroad; and a plurality of rail connection units individually integrally connecting the railroad to the traverse girder.
机译:本发明提供了一种用于建造铁路的横向结构的临时上桥,该临时上桥包括多个固定在建筑工段两侧的支撑桩,其中,通过单独地将铁道的下部结构驱动到铁路下部来建造该横向结构。接地以减少冲击和振动并具有出色的绝缘性能;一对纵向梁支撑在支撑桩的上端,并在铁路纵向上安装在施工段的两侧;多个横梁,其两端被支撑在纵向梁的上部,并且通过与铁路的下部交叉以固定的间隔安装在铁路的纵向上。多个轨道连接单元将轨道与横梁分别一体地连接。

著录项

  • 公开/公告号KR101392247B1

    专利类型

  • 公开/公告日2014-05-12

    原文格式PDF

  • 申请/专利权人 GMG CO. LTD.;SEOK JUNG CONSTRUCTION CO. LTD.;

    申请/专利号KR20130134552

  • 发明设计人 HWANG SUNG TAE;

    申请日2013-11-07

  • 分类号E01D15/12;

  • 国家 KR

  • 入库时间 2022-08-21 15:41:03

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号