首页> 外国专利> DOUBLE-ENDED METHOD OF DEPOSIT OPENING DURING UNDERGROUND OPERATIONS

DOUBLE-ENDED METHOD OF DEPOSIT OPENING DURING UNDERGROUND OPERATIONS

机译:地下作业过程中的开孔双端方法

摘要

FIELD: oil and gas industry.;SUBSTANCE: double-ended method of the deposit opening during underground operations includes shaft sinking of at least two holes, each hole having its own job site. Opening of the deposit is made by underground horizontal and/or inclined workings from each hole. As the shaft sinking progresses the underground horizontal workings are made from the hole at a distance of at least 5 diameters of the hole. Vertical wells are drilled from the surface and horizontal cuts and when the lower horizontal working is reached the well is drilled up to the project diameter of the air raise. Horizontal workings are placed vertically, one by one, at a distance to be determined by technical capabilities of the drilling rig. The upper part of the air raise is made from the surface through quaternary deposits by a usual method. At the first stage each end of the deposit is ventilated separately, at the second stage fresh air is supplied through a pair of combined developments - a borehole and the air riser at one end while outgoing jet is outputted through the combined developments of the other end.;EFFECT: method allows reducing scope of works during shaft sinking, increasing the sinking rate, reducing the period of construction and commissioning of a mine or minery, increasing reliability of ventilation due to ventilation risers.;3 dwg
机译:领域:地下作业期间沉积物开口的双端方法包括至少两个孔的井下沉,每个孔都有其自己的工作地点。沉积物的开采是通过每个孔的地下水平和/或倾斜作业进行的。随着竖井下沉的进行,地下水平作业是在距孔至少5个直径的距离处进行的。从地面和水平切口钻出垂直井,并在达到较低的水平工作高度时钻至气浮的投影直径。水平作业垂直一对一地放置,其距离取决于钻机的技术能力。鼓风的上部是通过常规方法从表面通过季沉积物制成的。在第一阶段,沉积物的每一端分别通风,在第二阶段,通过一对组合的装置供应新鲜空气-一端的井眼和进气管,而通过另一端的组合装置输出射流效果:该方法可以减少竖井下沉的工作范围,提高下沉率,缩短矿山或矿山的建造和调试时间,增加通风竖井带来的通风可靠性; 3 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号