首页> 外国专利> Non-destructive inspection method and non-destructive inspection apparatus for butt welding of the tube at the laying board

Non-destructive inspection method and non-destructive inspection apparatus for butt welding of the tube at the laying board

机译:铺设板上管对接的无损检测方法及无损检测装置

摘要

PROBLEM TO BE SOLVED: To assure a necessary work stage to efficiently utilize the work stage even on a comparatively small facility ship.;SOLUTION: A pipe Pa which is attempted to be newly connected is connected to the end of an already connected pipe Pb by butt welding on a stopped facility ship 1, then, predetermined length on the base end side of the already connected pipe is thrown into the sea simultaneously as moving the facility ship for the length of the pipe, after that, a sea bottom pipe line is constructed while sequentially repeating the butt welding of a pipe which is attempted to be newly connected, forward movement of the facility ship and throwing of the predetermined length on the base end side of the already connected pipe into the sea on the stopped facility ship. A nondestructive inspection process of a butt welding part of the pipe to be performed after a welding process for welding the pipe which is attempted to be newly connected to the end of the already connected pipe by butting is performed while moving the facility ship forward.;COPYRIGHT: (C)2012,JPO&INPIT
机译:解决的问题:即使在比较小的设施船上,也要确保必要的工作阶段以有效利用工作阶段。解决方案:试图重新连接的管道Pa通过以下方式连接到已连接的管道Pb的末端:在停止的设施船1上进行对接焊接,然后,在将设施船移动一定长度的管道的同时,将已连接管道的基端侧的预定长度抛入海中,之后,将海底管道在顺序地重复试图重新连接的管子的对接焊接时构造的结构,设施船向前运动并将预定长度的已连接管道的基端侧抛入停下的设施船的海中。在使设施船向前移动的同时,对试图通过对接而新尝试连接到已连接的管道的末端的管道进行焊接的焊接过程之后,进行管道的对接焊接部分的无损检查过程。版权:(C)2012,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号