首页> 外国专利> Pipe rehabilitation method , including the rehabilitation pipe inspection method and rehabilitation pipe inspection process .

Pipe rehabilitation method , including the rehabilitation pipe inspection method and rehabilitation pipe inspection process .

机译:管道修复方法包括修复管道检查方法和修复管道检查过程。

摘要

PROBLEM TO BE SOLVED: To provide a renewed pipe line with no uncured part or pinhole by an inspection method which can effectively detect an uncured part or a pinhole hardly detectable by visual inspection in renewal of an old pipe and by a pipe line renewal method including this inspection method.;SOLUTION: A pipe line defect inspection method for a pipe line, wherein a lining material comprising a tubular resin absorbent impregnated with a curable resin is inserted inside the pipe line and the inside of the lining material is cured by heating and pressurizing, includes: a step of forming a clearance between an existing pipe line and the lining material by using a difference of a linear expansion coefficient between them; a step of filling the clearance with water; and a step of inspecting whether there is water leakage from an uncured part or pinhole of the lining material. The linear expansion coefficient of the lining material is larger than that of the existing pipe line, and the clearance is formed between the existing pipe line and the lining material by a shrinkage difference between them in a cooling period after applying the lining material.;COPYRIGHT: (C)2012,JPO&INPIT
机译:解决的问题:通过检查方法提供一种没有未固化零件或针孔的更新后的管线,该方法可以有效地检测在旧管的更换中通过目视检查难以检测到的未固化零件或针孔,以及通过包括SOLUTION:一种管道的管道缺陷检查方法,其中,将包含浸渍有可固化树脂的管状树脂吸收剂的衬里材料插入管道内,并通过加热和加热使衬里材料内部固化。加压包括:通过利用它们之间的线性膨胀系数之差在现有管道和衬里材料之间形成间隙的步骤;用水填充间隙的步骤;检查未固化部分或衬里针孔是否漏水的步骤。衬里材料的线性膨胀系数大于现有管道的线性膨胀系数,并且在涂覆衬里材料后的冷却期间,通过在现有管道和衬里材料之间的收缩差形成间隙。 :(C)2012,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号