首页> 外国专利> A First Tube portion of a drillstring for connection with other portions of the tube of a drillstring by means of respective Connection means, probing System; method

A First Tube portion of a drillstring for connection with other portions of the tube of a drillstring by means of respective Connection means, probing System; method

机译:钻柱的第一管部分,用于通过相应的连接装置,探测系统与钻柱的管的其他部分连接;方法

摘要

A drillstring first tube portion (10) for connection to further tube portions (24,26) of a drillstring via respective connection means has a side wall (16) including non ferromagnetic material, and at least one downhole survey device (12) mounted directly or indirectly on or within the side wall. The survey device has at least one survey instrument to obtain survey data, a power source (22) and wireless communication means (18) to wirelessly receive and/or transmit survey data within or on the side wall. A method of conducting a downhole survey of drilling using such an apparatus is also disclosed, as well as a method of obtaining data gathered downhole. The survey device and a core orientation device (32) may communicate wirelessly, such as when passing each other.
机译:用于通过相应的连接装置连接到钻柱的另外的管部分(24,26)的钻柱的第一管部分(10)具有包括非铁磁材料的侧壁(16),以及至少一个直接安装的井下测量装置(12)或间接在侧壁上或侧壁内。该测量设备具有至少一个用于获得测量数据的测量仪器,电源(22)和用于在侧壁内或侧壁上无线地接收和/或发送测量数据的无线通信装置(18)。还公开了一种使用这种设备进行井下勘测的方法,以及一种获得井下收集的数据的方法。勘测设备和核心定向设备(32)可以无线地通信,诸如当彼此通过时。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号