首页> 外国专利> Reverse installation construction process of bolt ball net rack cylindrical shell storage bin

Reverse installation construction process of bolt ball net rack cylindrical shell storage bin

机译:螺栓球网架圆柱形壳体储物箱的反向安装施工工艺

摘要

A reverse installation construction process of a bolt ball net rack cylindrical shell storage bin is divided into installation of a starting unit and installation of overhanging small splicing units and comprises the steps of: using a numerical wind tunnel technology and a finite element algorithm to obtain sizes of net rack node rod members and making a construction drawing; completing the primary connection of the small splicing units on the ground in advance; completing the installation of the starting unit the starting unit being divided into sections A B and C which are assembled using a crane for integral installation; performing overhanging installation on the small splicing units from two sides of the starting unit to two ends of the cylindrical shell; and performing subsequent installation of a panel and internal devices after the installation of the net rack.
机译:螺栓球网架圆柱形壳体存放箱的反向安装过程分为启动单元的安装和悬垂的小型拼接单元的安装,包括以下步骤:使用数值风洞技术和有限元算法获得尺寸网架节点杆件的制作及施工图;提前完成地面上小型拼接单元的基本连接;完成启动单元的安装后,将启动单元分为A B和C部分,这些部分通过起重机组装在一起进行整体安装;从起始单元的两侧到圆柱壳的两端在小型拼接单元上进行悬垂安装;安装网架后,再进行面板和内部设备的后续安装。

著录项

  • 公开/公告号IN2014DN01860A

    专利类型

  • 公开/公告日2015-03-13

    原文格式PDF

  • 申请/专利权人

    申请/专利号IN1860/DELNP/2014

  • 发明设计人 NIU SHANGZHOU;WANG JIE;LIU YU;ZHU XINYING;

    申请日2014-03-11

  • 分类号E04H7/30;E04B1/35;E04G21/14;

  • 国家 IN

  • 入库时间 2022-08-21 15:14:45

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号