首页>
外国专利>
MAINTENANCE WORK PERIOD OPTIMIZATION APPARATUS AND MAINTENANCE WORK PERIOD OPTIMIZATION METHOD
MAINTENANCE WORK PERIOD OPTIMIZATION APPARATUS AND MAINTENANCE WORK PERIOD OPTIMIZATION METHOD
展开▼
机译:维护工作周期优化装置和维护工作周期优化方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a maintenance work period optimization apparatus capable of determining a proper work period on respective units each having different characteristics in failure occurrence ratio.SOLUTION: The maintenance work period optimization apparatus includes: a data storage section (10) that stores a failure ratio distribution data relevant to each of plural units; a unit classification section (20) that classifies the plural units into sharp change units, degradation units and stable units based on the failure ratio distribution data; a proper work period calculation section (30) that calculates proper work period for each unit. The unit classification section (20) performs a Welch verification to determine whether a unit is a sharp change unit or not, and performs a Cox-Stuart verification to determine whether a unit is a degradation unit or not. The proper work period calculation section (30) calculates correction work period according to the verification result in a quantitative manner.
展开▼