首页> 外国专利> Construction methods and buried joint structure and buried joint construction bracket assembly of buried joint structure

Construction methods and buried joint structure and buried joint construction bracket assembly of buried joint structure

机译:埋入式结构的施工方法,埋入式结构和埋入式施工支架组件

摘要

PROBLEM TO BE SOLVED: To realize a cut-off function in a relatively small girder joint gap part at a low cost.;SOLUTION: In a concrete parapet (breast wall) 110 and a concrete slab 120 positioned freely movably across a girder joint gap part G, concrete on an upper surface near the girder joint gap part G is removed to form a parapet (breast wall) construction hole 111 and a slab construction hole 121, a metal fitting assembly 10 which comprises a frame plate 11, a frame plate 12, a trapezoidal buffer material 32, anchor attaching ribs 13 and height adjusting structures 14 or the like, is inclined and face each other across the girder joint gap part G is arranged, is buried by placing site placed concretes 113, 123, and is then covered with a bituminous sheet 140, an asphalt pavement leveling layer and an asphalt pavement surface layer. Further, a secondary cut-off structure 30 for sealing by filling a seal material from a cloth bag 31 with a rubber sheet into a triangular space between the frame plate 11 and the frame plate 12 is constructed and a buried joint structure 100 is obtained.;COPYRIGHT: (C)2013,JPO&INPIT
机译:解决的问题:以较低的成本在相对较小的大梁缝隙部分中实现切断功能;解决方案:在混凝土护墙(胸墙)110和混凝土板120中可自由移动地跨过大梁缝隙在部分G中,去除梁连接间隙部分G附近的上表面上的混凝土,以形成护墙(胸壁)构造孔111和平板构造孔121;金属配件组件10,其包括框架板11,框架板如图12所示,梯形缓冲材料32,锚固件附接肋13和高度调节结构14等被布置成倾斜并且跨过梁连接间隙部分G彼此面对,并且通过在现场放置混凝土113、123而被掩埋,并且然后用沥青薄层140,沥青路面整平层和沥青路面表层覆盖。此外,构造了用于通过利用橡胶片将来自布袋31的密封材料用橡胶片填充到框架板11与框架板12之间的三角形空间中来进行密封的第二切除结构30,并且获得了埋入式接合结构100。 ;版权:(C)2013,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号