Power generation method for tunnel under construction and power generation system for tunnel under construction
Power generation method for tunnel under construction and power generation system for tunnel under construction
展开▼
机译:在建隧道的发电方法及在建隧道的发电系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a power generation method for a tunnel under construction and a power generation system for the same capable of saving power consumption of equipment in the tunnel under construction.SOLUTION: Turbid water discharged in association with construction of a tunnel 12 is treated with a turbid water treatment facility 18 and stored in a discharge tank 1806 as treatment water. The treatment water in the discharge tank 1806 is transferred to a pipe conduit 24 with a second submerged pump 25. The treatment water transferred to the pipe conduit 24 flows through the pipe conduit 24 toward a discharge port 2404 by pressure of the second submerged pump 25 as well as a water head difference of the pipe conduit 24. A waterwheel 2602 of a power generation unit 26 is rotationally driven by the treatment water sprayed through the discharge port 2404 (a spray nozzle 2404A) to enable a generator 2606 to generate power. The generated power is supplied to respective lighting equipment 32 from a distribution board 28 through a cable 38 and thereby activating the lighting equipment 32 to illuminate the turbid water treatment facility 18.
展开▼