首页> 外国专利> Integrated Planning and Management Tool Study Well

Integrated Planning and Management Tool Study Well

机译:综合规划和管理工具学习良好

摘要

In one example, an integrated tool for Planning and Management of study well is implemented by a computer system.The tool can receive a trajectory of a proposed well from a Surface to a Target to achieve through the underground Geological Drilling, and a Plan of study indicates the number, position and type of inspections to be performed in the Pit Durant And the drilling of the well.The tool can implement multiple error models depending on the type of study for the drilling of the well. Each error Model defines a corresponding uncertainty in order to achieve the goal through the underground Geological Drilling along the trajectory received.The tool can display a user interface, the trajectory of the well received and an indicator of uncertainty determined by applying the multiple error models.The indicator of uncertainty represents a combination of respective uncertainties defined by multiple error models and indicates an uncertainty in the drilling of the well received in the trajectory.
机译:在一个示例中,通过计算机系统实现了用于研究井的计划和管理的集成工具,该工具可以接收从地表到目标的拟议井的轨迹,以通过地下地质钻探和研究计划来实现表示要在Pit Durant和钻井中执行的检查的次数,位置和类型。该工具可以根据钻井的研究类型来实现多种误差模型。每个误差模型都定义了一个相应的不确定性,以便通过沿所接收轨迹的地下地质钻探来实现目标。该工具可以显示用户界面,接收井的轨迹以及通过应用多个误差模型确定的不确定性指标。不确定性指标表示由多个误差模型定义的各个不确定性的组合,并且表示在轨迹中接收的井的钻井中的不确定性。

著录项

  • 公开/公告号AR097937A1

    专利类型

  • 公开/公告日2016-04-20

    原文格式PDF

  • 申请/专利权人 HALLIBURTON ENERGY SERVICES INC.;

    申请/专利号AR2014P103718

  • 发明设计人

    申请日2014-10-06

  • 分类号E21B43/30;E21B44;E21B47/022;

  • 国家 AR

  • 入库时间 2022-08-21 14:27:38

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号