首页> 外国专利> Method for laying overhead lines for high voltage overhead lines

Method for laying overhead lines for high voltage overhead lines

机译:高压架空线敷设架空线的方法

摘要

The method involves tensioning a cable between poles e.g. supporting poles, where the cable comprises a core wire designed as a high strength aluminum clad invar (HACIN) wire, and a cladding wire designed as a temperature resistant aluminum (TAL) wire or zirconium temperature resistant aluminum (ZTAL) wire. The cable is elongated after fixation of the cable at the poles at a pre-determined time period of about 30 to 60 minutes with a pre-determined force such that the wires are elastically elongated under displacement of transition points at low temperature.
机译:该方法包括张紧两极之间的电缆。支撑杆,其中电缆包括设计为高强度铝包层殷钢(HACIN)线的芯线和设计为耐高温铝(TAL)线或耐高温锆铝(ZTAL)线的包层线。在将电缆固定在两极处之后,以预定的力以大约30至60分钟的预定时间将电缆拉长,从而使电线在低温下的过渡点位移下弹性拉长。

著录项

  • 公开/公告号PL2367247T3

    专利类型

  • 公开/公告日2016-09-30

    原文格式PDF

  • 申请/专利权人

    申请/专利号PL19790100029T

  • 发明设计人 POHLMANN HEINRICH;FIERS PETER;

    申请日2010-03-20

  • 分类号H02G1/04;H01B5/10;

  • 国家 PL

  • 入库时间 2022-08-21 14:23:38

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号