首页> 外国专利> Peristaltic pump and method for controlling the peristaltic pump, preferably for distillation columns

Peristaltic pump and method for controlling the peristaltic pump, preferably for distillation columns

机译:蠕动泵和控制蠕动泵的方法,优选用于蒸馏塔

摘要

peristaltic pump, especially for distillation columns, equipped with a reflux condenser, the condenser and the elbows, characterised by the fact that the condenser (ks) over the adapter () is connected, on the one hand pump regulating steam (vm), while the pump regulating steam (vm) is connected by lap (ko) of the condenser (ch), furthermore, the condenser (ks) is connected with the other side.the above connector (2) with a pump regulating liquid (lm) with the bottom part of the condenser (ks) is completed (with connector), by which the condenser (ks) is connected with the main body column (kk), with the columns (kk) in the lower part of the ending is url (of), by which the column (kk) is connected with the main body of grzau0142ek (kzg)with the team grzau0142ek (kzg) is provided with a grzau0142ek (conf).a control perystaltycznej pump, especially for distillation columns using condenser, elbows and the condenser, is that in the first stage, changing pump regulating liquid (lm) based on the entered sequence, which is attributed to the next stages work column distillation.in the second stage pump regulating steam (vm) takes a few of the lower part of the condenser (ks), whereby the pump capacity regulating steam (vm) is amended by pid algorithm, where the input to the pump regulating (vm), received from the controller (s) is the deviation of temperaturein the next stage, which sczytuje with sensor (cz) placed on the outer surface of the columns (kk), in the next stage of steam pump regulating steam (vm) is directed through the elbow (ko) of the radiator (ch).
机译:蠕动泵,特别是用于蒸馏塔的蠕动泵,配备有回流冷凝器,冷凝器和弯头,其特点是一方面连接调节器()上的冷凝器(ks),另一方面调节蒸汽(vm)的泵泵调节蒸汽(vm)通过冷凝器(ch)的搭接部(ko)连接,此外,冷凝器(ks)与另一侧连接。上述连接器(2)带有泵调节液(lm),冷凝器(ks)的底部完成(带有连接器),冷凝器(ks)与主体柱(kk)连接,末端的下部(kk)为url( of),通过该组件,将列(kk)与grza u0142ek(kzg)的主体连接,团队grza u0142ek(kzg)配备了grza u0142ek(conf).perystaltycznej可控泵蒸馏塔使用冷凝器,弯头和冷凝器,是在第一阶段中,改变泵调节液(lm)的基础d按输入的顺序进行,这归因于下一阶段的工作塔蒸馏。在第二阶段中,泵调节蒸汽(vm)占据冷凝器下部(ks)的一部分,从而调节蒸汽的泵容量(vm)通过pid算法进行修正,其中从控制器(s)接收到的泵调节(vm)的输入是下一阶段的温度偏差,该偏差与传感器(cz)一起放置在色谱柱的外表面(kk ),在下一阶段的蒸汽泵中,调节蒸汽(vm)穿过散热器(ch)的弯头(ko)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号