首页> 外国专利> METHODS FOR MANAGING FORMATION VOIDAGE REPLACEMENT IN WATERFLOOD PRODUCTION OPERATIONS TO INCREASE OIL RECOVERY

METHODS FOR MANAGING FORMATION VOIDAGE REPLACEMENT IN WATERFLOOD PRODUCTION OPERATIONS TO INCREASE OIL RECOVERY

机译:在水驱生产作业中管理地层置换的方法以提高采油量

摘要

A method for waterflooding of a reservoir in a subterranean formation includes (a) appraising the reservoir to obtain a plurality of physical properties relating to the formation and the oil in the reservoir. The plurality of physical properties include a reservoir pressure and a Bubblepoint pressure of the oil in the reservoir. The method also includes (b) determining that the Bubblepoint pressure is greater than 60% of the reservoir pressure. In addition, the method includes (c) waterflooding the reservoir at a voidage replacement ratio (VRR) less than 1.0 based on the determination in (b).
机译:一种用于对地下地层中的储层进行注水的方法,包括:(a)评估储层以获得与地层和储层中的油有关的多种物理性质。多种物理性质包括储层压力和储层中油的泡点压力。该方法还包括(b)确定泡点压力大于储层压力的60%。另外,该方法包括(c)基于(b)中的确定以小于1.0的空隙置换率(VRR)注水储层。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号