首页> 外国专利> AUXILIARY DEVICE FOR POWER DISTRIBUTION FACILITY LIVE-LINE WORKING, AND POWER DISTRIBUTION FACILITY LIVE-LINE WORKING METHOD USING SAME

AUXILIARY DEVICE FOR POWER DISTRIBUTION FACILITY LIVE-LINE WORKING, AND POWER DISTRIBUTION FACILITY LIVE-LINE WORKING METHOD USING SAME

机译:配电设施实线工作辅助装置及使用该方法的配电设施实线工作方法

摘要

A power distribution facility live-line working method is disclosed. The power distribution facility live-line working method of the present invention comprises the steps of: mounting an temporary arm part on an electric pole; transferring an electric wire connected to the electric pole to an electric wire support part mounted on the temporary arm part; by moving the temporary arm part or the electric wire support part upward, separating the electric wire from an existing LP insulator pre-installed on a regular pole; replacing the existing LP insulator with a new LP insulator; moving the temporary arm part or the electric wire support part downward toward the new LP insulator; and transferring the electric wire connected to the electric wire support part to the new LP insulator.
机译:本发明公开了一种配电设备带电作业方法。本发明的配电设备带电作业方法包括以下步骤:将临时臂部安装在电极上;将连接到电极的电线转移到安装在临时臂部上的电线支撑部。通过向上移动临时臂部分或电线支撑部分,将电线与预先安装在规则杆上的现有LP绝缘子分开;用新的低压绝缘子替换现有的低压绝缘子;将临时臂部分或电线支撑部分向下移向新的低压绝缘子;将与电线支撑部连接的电线转移至新的LP绝缘体。

著录项

  • 公开/公告号WO2015190813A1

    专利类型

  • 公开/公告日2015-12-17

    原文格式PDF

  • 申请/专利权人 SEOKWANG ELECTRICITY COMMUNICATION CO. LTD.;

    申请/专利号WO2015KR05796

  • 发明设计人 CHOI MIN SOO;

    申请日2015-06-09

  • 分类号H02G7;H02G1/02;

  • 国家 WO

  • 入库时间 2022-08-21 14:20:04

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号