METHOD AND INSTALLATION FOR MECHANICAL EXCAVATION OF A CROSS PASSAGE BETWEEN TWO TRAFFIC TUNNELS OR BETWEEN TWO VERTICAL WELLS

机译:机械开挖两个交通隧道或两个竖井之间的过道的方法和安装

摘要

The present invention relates, in particular, to a method for mechanical excavation of a cross passage (6) between two traffic tunnels (1, 2) or between two vertical wells, characterized by the fact that it comprises a series of steps as follows: i/ a first section (6a) of metal tube equipped with a cutting lip, the internal diameter of said tube being equal to the internal diameter of said cross passage (6), is driven forward from a first (1; 2) of said two tunnels (1, 2) or wells, in the direction of said second tunnel (2; 1) or well; ii/ a second section (6b), having the same diameter, is placed behind said first section (6a) of tube and in extension thereof, and said two sections (6a, 6b) are driven forward together; iii/ operation ii/ is repeated as required; said tube sections (6a, 6b, 6c) being left in place and the materials contained in the tube being evacuated later.
机译:本发明尤其涉及一种用于在两个交通隧道(1、2)之间或在两个垂直井之间进行横向通道(6)的机械开挖的方法,其特征在于,该方法包括以下一系列步骤:从配备有切割唇的金属管的第一部分(6a)开始,从所述金属管的第一(1; 2)向前驱动,所述金属管的内径等于所述横向通道(6)的内径。在所述第二隧道(2; 1)或井的方向上的两个隧道(1、2)或井; ii /具有相同直径的第二部分(6b)放置在所述管的第一部分(6a)的后面并在其延伸处,并且所述两个部分(6a,6b)一起向前驱动; iii /根据需要重复操作ii /;所述管部分(6a,6b,6c)被留在原处,并且容纳在管中的材料随后被抽空。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号