首页> 外国专利> CONCURRENT CONSTRUCTION METHOD OF GROUND AND UNDERGROUND BUILDING STRUCTURES

CONCURRENT CONSTRUCTION METHOD OF GROUND AND UNDERGROUND BUILDING STRUCTURES

机译:地下和地下建筑结构的同时施工方法

摘要

The present invention relates to a concurrent construction method of ground and underground building structures to construct a high-rise building in a city or in a built-up area. For this, steel frames and rebars are priorly installed in a column structure from the ground floor to the lowermost basement floor regardless of the column frame structure of a building, such as a steel structure, a reinforced concrete structure, and a steel framed reinforced concrete structure; a slab for the ground floor and subsequently for the first basement floor are constructed and completed; a column structure for the lowermost basement floor is formed in the same manner as above and a slab work for the lowermost basement floor is completed; and the construction of the bearing wall of the basement floors and the construction of the column structure, slab, and bearing wall of the ground floors are continuously and concurrently carried out when the column structure and slab of the basement floors are completed.;COPYRIGHT KIPO 2016
机译:地面和地下建筑结构的同时施工方法技术领域本发明涉及一种地面和地下建筑结构的同时施工方法,以在城市或建成区中建造高层建筑物。为此,无论建筑物的钢结构,钢筋混凝土结构,钢结构钢筋混凝土等建筑物的钢柱框架结构如何,都预先将钢框架和钢筋安装在从地下到最下层地下室的圆柱结构中。结构体;建造并完成了一层用于地下室的平板,随后建造了一层地下室。以与上述相同的方式形成最下层地下室的柱状结构,并完成最下层地下室的楼板工作。当地下室的柱结构和板完成时,地下室的承重墙的建设以及地下层的柱结构,板和承重墙的建设是连续并发地进行的。 2016年

著录项

  • 公开/公告号KR20150137285A

    专利类型

  • 公开/公告日2015-12-09

    原文格式PDF

  • 申请/专利权人 KIM CHUNG GI;LEE YOUNG BOK;

    申请/专利号KR20140064886

  • 发明设计人 LEE YOUNG BOKKR;KIM CHUNG GIKR;

    申请日2014-05-29

  • 分类号E04B1/35;

  • 国家 KR

  • 入库时间 2022-08-21 14:15:45

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号