首页> 外国专利> IMPLEMENTING EDIT AND UPDATE FUNCTIONALITY WITHIN A DEVELOPMENT ENVIRONMENT USED TO COMPILE TEST PLANS FOR AUTOMATED SEMICONDUCTOR DEVICE TESTING

IMPLEMENTING EDIT AND UPDATE FUNCTIONALITY WITHIN A DEVELOPMENT ENVIRONMENT USED TO COMPILE TEST PLANS FOR AUTOMATED SEMICONDUCTOR DEVICE TESTING

机译:在用于编译自动半导体设备测试的测试计划的开发环境中实现编辑和更新功能

摘要

how to debug the test procedure are disclosed for automated device testing. The method includes that saves state information for one and test plan for receiving a command to update the at least one modified test procedure modified in the first debugging session, the above state information on the breakpoint entry position including the information and, above revised test procedure is invoked within the scope of the test plan. The method involves the unloading of the test procedure is modified to defer the execution of the above, and the above test plan subsequently. It also includes using the above compiled file after it, and to compile the above modified test procedures in order to produce a compiled file to re-load the above test procedure in the above test plan. Lastly, it involves the interruption of the above execution at the breakpoint corresponding to the upper breakpoint entry positions in one and the above second debugging session to resume the execution of the above modified test procedure in the second debug session. ;
机译:公开了如何调试测试程序以进行自动设备测试。该方法包括保存用于一个的状态信息和用于接收命令以更新在第一调试会话中修改的至少一个修改的测试过程的测试计划,上述关于断点进入位置的状态信息包括该信息,以及上述修改的测试过程。在测试计划范围内调用。该方法涉及卸载测试程序,以延迟执行上述操作,并随后执行上述测试计划。它还包括在其后使用上述编译文件,以及编译上述修改后的测试过程,以便生成一个编译文件,以便在上述测试计划中重新加载上述测试过程。最后,它涉及在一个和以上第二调试会话中与上断点入口位置相对应的断点处中断上述执行,以在第二调试会话中恢复上述修改的测试过程的执行。 ;

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号