首页> 外国专利> MINE DISASTER MANAGEMENT SYSTEM AND MANAGEMENT METHOD USING SAME

MINE DISASTER MANAGEMENT SYSTEM AND MANAGEMENT METHOD USING SAME

机译:相同的矿山灾害管理系统及管理方法

摘要

According to an embodiment of the present invention, a mine disaster management method comprises: a first transmission step of enabling a management server to transmit a survey file including a first survey chart having each process performed in the mine, a dangerous element corresponding to the process, and a first evaluation score for the dangerous element and a second survey chart having a dangerous degree and a first evaluation index corresponding to the dangerous degree; a second transmission step of enabling a worker terminal to transmit a response file including a first response file including the first survey chart in which the first evaluation score is inputted based on the first evaluation index after receiving the survey file; and a dangerous process determination step of enabling the management server to determine a dangerous process by comparing the total values in which the first evaluation scores in the first survey chart of the first response file are added in each process.;COPYRIGHT KIPO 2016
机译:根据本发明的实施例,一种地雷灾害管理方法包括:第一传输步骤,其使得管理服务器能够传输调查文件,该调查文件包括具有在矿井中执行的每个处理的第一调查图,与该处理相对应的危险要素。危险要素的第一评价分数和具有危险度以及与该危险度对应的第一评价指标的第二调查图;第二发送步骤,使工作人员终端在接收到调查文件后,基于第一评价指标,发送包括第一响应文件的响应文件,该第一响应文件包括第一调查图,在该第一调查表中输入第一评价分数。危险过程确定步骤;通过比较在每个过程中添加了第一响应文件的第一调查图中的第一评估得分的总值,使管理服务器能够确定危险过程的步骤。COPYRIGHTKIPO 2016

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号