首页> 外国专利> This series of complete renewal of the track ferree.

This series of complete renewal of the track ferree.

机译:这一系列的履带完全更新。

摘要

The method involves performing clearing operation (D) of a ballast by a ballast clearing vehicle that evacuates dirt extracted from dirt transport wagons (TR) circulating on a side track (V2) along a work track (V1). Ballast installation operations are performed. The extracted dirt is evacuated (TF) from the work track toward the dirt transport wagons during operation of replacing of the ballast. The replacement of the ballast and the ballast clearing operation are carried by different independent vehicles. An independent claim is also included for an axle system for a railway vehicle.
机译:该方法包括由压载物清算车辆执行压载物的清零操作(D),该压载物清运车辆将从工作轨道(V1)上在侧轨道(V2)上循环的污物运输车(TR)抽出的污物排空。进行镇流器安装操作。在更换压载物的操作期间,将提取的污物从工作轨道向污物运输车排空(TF)。压载物的更换和压载物清理操作由不同的独立车辆进行。还包括铁路车辆的车轴系统的独立权利要求。

著录项

  • 公开/公告号FR2960006B1

    专利类型

  • 公开/公告日2016-02-05

    原文格式PDF

  • 申请/专利权人 DELCOURT FERROVIAIRE (DFC);

    申请/专利号FR20100053805

  • 发明设计人 GUY DELCOURT;

    申请日2010-05-17

  • 分类号E01B27/11;

  • 国家 FR

  • 入库时间 2022-08-21 14:08:46

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号