首页>
外国专利>
JIG FOR INSTALLATION AND COVERING FROM WEATHER OF LINING PLATE AND METHOD FOR INSTALLATION OF LINING PLATE USING THE JIG
JIG FOR INSTALLATION AND COVERING FROM WEATHER OF LINING PLATE AND METHOD FOR INSTALLATION OF LINING PLATE USING THE JIG
展开▼
机译:用于安装和覆盖衬板的天气的夹具以及使用该夹具安装衬板的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a jig for protecting a lining plate from rainwater or snow when installing the lining plate without obstructing efficiency of work of each construction even if performing framework construction and machine construction together by using a large lifting facility.SOLUTION: A jig includes: a traversing rail 9; a sleeper 8 for supporting the traversing rail 9; a trolley 10 for enabling the traversing rail 9 to move laterally; a hoist crane 11 mounted to the trolley 10; a hanging hook 12a of the hoist crane 11; a first pipe support 14a for supporting one side of the sleeper 8 and mounted in a handrail 5b provided in a vessel type structure; a sleeper support 15 for supporting the other side of the sleeper 8 and mounted in a working floor 4b installed in a lining vessel 3; and a roof member 16 supported by a second pipe support 14b mounted in the handrail 5b and a third pipe support 14c mounted in the working floor 4b and for performing protection from rainwater and snow in the installation work of the lining plate.SELECTED DRAWING: Figure 2
展开▼