首页>
外国专利>
HOLDING DEVICE OF VIBRATION HAMMER, AND INSTALLATION METHOD OF STEEL PIPE PILE
HOLDING DEVICE OF VIBRATION HAMMER, AND INSTALLATION METHOD OF STEEL PIPE PILE
展开▼
机译:振动锤的保持装置及钢管桩的安装方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a holding device of a vibration hammer capable of holding a steel pipe by exerting pressing force only from inside of the steel pipe, along with an installation method of a steel pipe pile using the same.;SOLUTION: A holding device of a vibration hammer VH is for holding a steel pipe P by exerting pressing force on an inner surface of the steel pipe P, and includes a pressing rubber part 22 at a location that would not cause deformation or buckling of the steel pipe due to the pressing force, the pressing rubber part exerting the pressing force on the inner surface of the steel pipe by being elastically deformed by air. The pressing rubber part is of a double structure of an inner hollow rubber tube 22a and an outer solid rubber band 22b, or of a single structure of either the inner rubber tube or the outer rubber band. One or a plurality of chuck units is provided, having vibromotive force of the vibration hammer conveyed from above and being connected in a vertical direction. An enclosure 21 of the chuck unit includes a cylindrical body part 21A. The pressing rubber part is positioned on an outer peripheral surface of the cylindrical body part, and the air is supplied to and exhausted from the pressing rubber part through an inner space of the cylindrical body part.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2017,JPO&INPIT
展开▼