CONNECTION METHOD OF PILE CONSTITUTING MEMBER AND PILE CONSTRUCTION MACHINE

机译:桩工构件与桩工机的连接方法

摘要

PROBLEM TO BE SOLVED: To reduce a processing cost and a transport cost to a pile constituting member, and to reduce labor required for positioning work in connection time.;SOLUTION: In a connection method for mutually overlapping and connecting mutual steel pipes 101 and 101 for constituting a pile body, the connection method of a pile constituting member is provided with a pile constituting member arrangement step of overlapping and installing one steel pipe 101 in an upper end part of the other steel pile 101 installed on the ground, a connection hole forming step of forming a first connection hole 10 and a second connection hole 20 so that both steel pipes 101 and 101 penetrate in the overlapping direction and a connection member fitting step of fitting a wedge member after arranging an engaging member in the formed connection holes 10 and 20, in which the connection hole forming step forms the connection holes 10 and 20 by a drilling tool 51 provided in a press-in machine of installing the one steel pile 101 on the ground.;SELECTED DRAWING: Figure 12;COPYRIGHT: (C)2018,JPO&INPIT
机译:解决的问题:减少处理成本和向桩构成部件的运输成本,并减少在连接时间内进行定位工作所需的劳力。解决方案:在相互重叠并相互连接钢管101和101的连接方法中为了构成桩体,在桩构成部件的连接方法中,设置有桩构成部件的配置步骤,该步骤在将一根钢管101重叠并设置在设置于地面的另一根钢管101的上端部上的状态下进行连接。形成第一连接孔10和第二连接孔20以使钢管101和101都沿重叠方向穿过的形成步骤,以及在将接合构件布置在形成的连接孔10中之后装配楔形构件的连接构件装配步骤。参照图20和图20,其中连接孔形成步骤通过设置在安装机的压入机中的钻孔工具51形成连接孔10和20。将一个钢桩101悬挂在地面上;选定的图纸:图12;版权所有:(C)2018,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号