首页> 外国专利> Tower assembling / demolition construction method and equipment with a stand bar

Tower assembling / demolition construction method and equipment with a stand bar

机译:带有立杆的塔架组装/拆除施工方法和设备

摘要

PROBLEM TO BE SOLVED: To eliminate the need to secure a large site for fixing the base end of a branch line onto a ground, to surely support a stand bar by three branch lines, and to enable the tension management of the branch lines to be performed on the ground, in a stand bar method.SOLUTION: In a stand bar method, a base end part of a stand bar is supported by a steel tower T during assembling or demolition, a tip of a derricking wire branch line 2a is supported at a tip of the stand bar 1 and the other end thereof is supported at a steel tower point, ends of two bracing branch lines 2b are fixed to the tip of the stand bar 1, and the other ends thereof are extended to right and left sides of the stand bar 1 respectively. An intermediate branch line support rod 4 is almost horizontally fixed at a steel tower T point below the support point of the base end part of the stand bar 1, both ends of the intermediate branch line support rod 4 are made to project to the outsides of nearly left and right side positions of the stand bar 1, the other ends of the bracing branch lines 2b are slidably locked once to the tip of the intermediate branch line support rod 4 and further are respectively fixed to foundation parts 5 of the steel tower T, and steel tower members are lifted by a suspension wire 3 provided on the stand bar 1.
机译:解决的问题:消除了将支线的底端固定到地面上的大型场地的需要,通过三根支线可靠地支撑立杆并能够对支线进行张力管理的问题。解决方案:在立杆法中,在组装或拆卸过程中,立杆的底端部分由钢塔T支撑,支撑架空钢丝支线2a的末端。在立杆1的顶端处支撑其另一端,并且在钢塔点处支撑该支撑支柱,两条支撑分支线2b的端部固定在立杆1的顶端,并且其另一端向左右延伸。立杆1的两侧。中间分支线支撑杆4几乎水平地固定在立杆1的基端部的支撑点下方的钢塔T点处,该中间分支线支撑杆4的两端都向外侧突出。支撑支线2b的几乎在左侧和右侧位置附近,支撑支线2b的另一端一次滑动地锁定到中间支线支撑杆4的末端,并且进一步分别固定到钢塔T的基础部分5然后,通过设置在立杆1上的吊线3来抬起钢塔构件。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号