首页> 外文会议>International Conference on Applied Mechanics and Manufacturing System >Construction Methods on Mechanical and Material's Deformation Control during Assembling and Erecting Cup type Transmission Tower
【24h】

Construction Methods on Mechanical and Material's Deformation Control during Assembling and Erecting Cup type Transmission Tower

机译:机械和材料变形控制在组装和架设杯式传输塔上的施工方法

获取原文

摘要

Take a 1000kV Cup-Type tubular steel test tower as research object, and it is the first one of this type used in heavy ice area. Research on the assembly load's affect to tower structure was made. The process of assembling tower using suspend guyed pole was analyzed with Finite Element Method. Structures overhanging the tower body, such as cross arms and bracket of earth wire, could be assembled in different ways. The different affect to the built structure corresponding to different assembly method was researched. The objective is to make the deformation of the structure minimum. It was indicated that, reinforce the K-joint by cable and the deformation of structure reduced obviously. The reinforce method is simple and efficient, and ensure the cross arm assembling smoothly. It is avail to improve the assemble quality of the whole structure.
机译:采用1000kV杯型管状钢试验塔作为研究对象,是重型冰区中使用的第一种类型。制作了大会载荷对塔结构的影响。用有限元法分析使用悬挂杆组装塔的过程。可以以不同的方式组装伸出塔架的结构悬垂塔架,例如横臂和地线的括号。研究了对对应于不同装配方法的内置结构的不同影响。目的是使结构变形最小。表示,通过电缆加固K关节,结构变形明显减少。增强方法简单富有高效,并确保交叉臂平稳地组装。有利于提高整个结构的组装质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号