首页> 外国专利> Installation or replacement method of inverted tunnel in service

Installation or replacement method of inverted tunnel in service

机译:在役隧道的安装或更换方法

摘要

To provide a method of changing the invert of a tunnel under service which is superior in strength and durability by carrying out integral construction of invert while maintaining alternate passage on one side.SOLUTION: The present invention relates to a method of manufacturing a pedestal comprising steps of alternately removing one side of pavement, a step of alternately placing a plurality of piles on one side from which the pavement has been removed, a step of placing a cross girder on the piled head A step of removing a lining plate on one side and excavating the ground to alternately remove the invert to form a space portion; a step of forming a space portion on the center side A step of laying a lining plate on both end sides of the space plate, removing the lining plate on both end sides and casting the concrete on the bottom surface of the space part so as to integrally form the invert, and removing the lining plate on one side, A step of laying a lining plate on one side and alternately back filling over the invert on one side with road flooring material and a step of paving the top of the backfilled road flooring material with concrete.(FIG.
机译:本发明提供一种在使用中改变隧道的倒置的方法,该方法通过进行倒置的整体构造同时保持一侧的交替通过而在强度和耐用性方面具有优越性。解决方案:本发明涉及一种包括以下步骤的制造基座的方法:交替地去除人行道的一侧的步骤,交替地在已去除人行道的一侧上放置多个桩的步骤,在堆积的头上放置横梁的步骤,在一侧去除衬板的步骤以及挖掘地面以交替去除倒置物以形成空间部分;在中心侧形成空间部的步骤在空间板的两端侧上放置衬板,在两端侧上移除衬板并将混凝土浇铸在空间部的底表面上的步骤如下:一体地形成倒置板,并在一侧上移除衬板。在一侧上放置衬板,并在另一侧上用道路地板​​材料交替回填到倒置板上的步骤,以及在回填的道路地板的顶部进行铺装的步骤用混凝土制成的材料。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号