首页>
外国专利>
Determining and considering petroleum reservoir reserves and production characteristics when valuing petroleum production capital projects
Determining and considering petroleum reservoir reserves and production characteristics when valuing petroleum production capital projects
展开▼
机译:在评估石油生产资本项目时确定并考虑石油储量和生产特征
展开▼
页面导航
摘要
著录项
相似文献
摘要
Determining a True Value Index™ (TVI™) for a petroleum production capital project provides a novel indicator and metric that is designed to quickly assess the economics of undertaking the petroleum production capital project. The TVI™ can be determined according to the following equation:TVI=NPV+(β*Reserves)where, NPV=Net present value of a project;β=Reservoir Management Factor (RMF™)=absolute value (sum of Coefficient of Reserves and Coefficient of Production) derived from multivariable correlation=to reflect the market value premium on increased reserves if the producer was public; andReserves=Barrels of proven reserves to be created by the project.展开▼