首页> 外国专利> Computer-implemented system and method for generating a risk-adjusted probabilistic forecast of renewable power production for a fleet

Computer-implemented system and method for generating a risk-adjusted probabilistic forecast of renewable power production for a fleet

机译:用于为车队生成风险调整后的可再生能源发电的概率预测的计算机实现的系统和方法

摘要

Probabilistic forecasts of the expected power production of renewable power sources, such as solar and wind, are generally provided with a degree of uncertainty. The expected power production for a fleet can be projected as a time series of power production estimates over a time period ahead of the current time. The uncertainty of each power production estimate can be combined with the costs and risks associated with power generation forecasting errors, and displayed or visually graphed as a single, deterministic result to assist power grid operators (or planners) in deciding whether to rely on the renewable power source.
机译:对可再生能源(例如太阳能和风能)的预期发电量的概率预测通常具有一定程度的不确定性。可以将车队的预期发电量预测为当前时间之前一段时间内的发电量估计时间序列。每个发电量估算的不确定性都可以与发电预测误差相关的成本和风险相结合,并作为单个确定性结果显示或直观地显示出来,以帮助电网运营商(或计划者)确定是否依赖可再生能源能量源。

著录项

  • 公开/公告号US9638831B1

    专利类型

  • 公开/公告日2017-05-02

    原文格式PDF

  • 申请/专利权人 CLEAN POWER RESEARCH L.L.C.;

    申请/专利号US201314139007

  • 发明设计人 THOMAS E. HOFF;

    申请日2013-12-23

  • 分类号G01W1/10;

  • 国家 US

  • 入库时间 2022-08-21 13:43:02

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号