首页> 外国专利> Job scheduling optimization based on ratio of stall to active cycles

Job scheduling optimization based on ratio of stall to active cycles

机译:基于停顿与活动周期比率的作业调度优化

摘要

An apparatus and a job scheduling method are provided. For example, the apparatus is a multi-core processing apparatus. The apparatus and method minimize performance degradation of a core caused by sharing resources by dynamically managing a maximum number of jobs assigned to each core of the apparatus. The apparatus includes at least one core including an active cycle counting unit configured to store a number of active cycles and a stall cycle counting unit configured to store a number of stall cycles and a job scheduler configured to assign at least one job to each of the at least one core, based on the number of active cycles and the number of stall cycles. When the ratio of the number of stall cycles to a number of active cycles for a core is too great, the job scheduler assigns fewer jobs to that core to improve performance.
机译:提供一种设备和作业调度方法。例如,该设备是多核处理设备。该装置和方法通过动态管理分配给该装置的每个核心的最大作业数,来最小化由共享资源引起的核心的性能下降。该装置包括至少一个核心,该核心包括:活动周期计数单元,其配置为存储多个活动周期;以及失速周期计数单元,其配置为存储多个失速周期;以及作业调度器,其配置为将至少一个作业分配给每个作业周期。基于活动周期数和停顿周期数的至少一个内核。当某个内核的停顿周期数与活动周期数之比太大时,作业调度程序会为该内核分配较少的作业,以提高性能。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号