首页> 外国专利> systems and methods for monitoring and validating cementation operations using connection flow monitor (cfm) system

systems and methods for monitoring and validating cementation operations using connection flow monitor (cfm) system

机译:使用连接流量监控器(cfm)系统监控和验证固井作业的系统和方法

摘要

Summary Systems and Methods for Monitoring and Validating Cementing Operations Using a Connection Flow Monitor (CFM) System A fluid monitoring system is disclosed. The monitoring system comprises a data acquisition and control interface and one or more fluid metering devices communicatively coupled to the data acquisition and control interface. One or more fluid metering devices are configured to detect amounts of fluid pumped into or out of the wellbore. the data acquisition and control interface receives a first data set comprising calculated volumes and / or pressures of a flow of one or more fluids exiting a model well over a predetermined period of time, based in part on a reaction heat produced by curing a cementitious composition and a second data set comprising volumes and / or pressures of a flow of one or more fluids pumped into or out of the wellbore from one or more metering devices of fluids. The data acquisition and control interface uses the first and second data sets received to determine one or more characteristics of the cement composition.
机译:使用连接流量监测器(CFM)系统监测和验证固井作业的概要系统和方法公开了一种流体监测系统。该监测系统包括数据采集和控制接口以及通信地耦合到该数据采集和控制接口的一个或多个流体计量装置。一个或多个流体计量装置被配置为检测泵送入或流出井眼的流体量。数据获取和控制接口接收第一数据集,该第一数据集部分地基于通过固化水泥组合物而产生的反应热,该第一数据集包括在预定时间段内离开模型井的一种或多种流体的计算出的体积和/或压力。第二数据集包括从一种或多种流体计量装置泵入或流出井眼的一种或多种流体的流量和/或压力。数据采集​​和控制接口使用接收到的第一和第二数据集来确定水泥组合物的一个或多个特性。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号