首页> 外国专利> mode of education of artificial glacier on the mountain river and installation for its implementation

mode of education of artificial glacier on the mountain river and installation for its implementation

机译:山区河流人工冰川教育模式及其实现安装

摘要

the invention relates to u0433u0438u0434u0440u043eu0442u0435u0445u043du0438u0447u0435u0441u043au043eu043cu0443 building facilities for the irrigation of arid lands and means to combat global u043fu043eu0442u0435u043fu043bu0435u043d u0438u0435u043c climate change on the planet. the technical result of the declared objects is the rapid growth of artificial glacier, mass and dimensions of a strengthening in the winter, and in summer time i.the artificial glaciers in mountain gorges is a natural source of new river with sustainable water regime, which can irrigate hundreds of thousands of hectare dry areas that drastically change the environmental and demographic situation in the region.mode of education of artificial glacier on the mountain the river includes the establishment of the course of the river, at an altitude of at 2500 m above sea level, u043du0438u0437u043au043eu043du0430u043fu043eu0440u043du043eu0439 dam post u043eu044fu043du043du043eu0435 u043fu0440u043eu043cu043eu0440u0430u0436u0438u0432u0430u043du0438u0435 before her first ground, and then the water in the upper u0431u044cu0435u0444u0435 related.u043fu0440u043eu043cu043eu0440u0430u0436u0438u0432u0430u043du0438u0435 exercise tube u0441u0432u0430u044fu043cu0438 containing cooling elements through which u043fu0440u043eu043au0430u0447u0438u0432u0430u044eu0442 liquid u0445u043bu0430u0434u043eu043du043eu0441u0438u0442u0435u043bu044c with negative tempera the tour. as the growth of the ice pool cooling elements derive from tubular piles, and have a mass of ice.in the course of the river first, above the ice basin downstream, and some time later and below it are new blocks of refrigerated tube piles, u0443u043au0440u0435u043fu043bu044fu044eu0449u0438 the soil beneath the glacier and prevents its drift. in this u043bu0435u0434u043eu0441u0431u043eu0440u043du044bu0439 pool itself plays the role of a dam, the height and the thickness of which is constantly increasing.the artificial creation of glacier ends when its thickness is 80 to 100 meters. work device for u0445u043bu0430u0434u043eu043du043eu0441u0438u0442u0435u043bu044f year-round circulation, cooling the soil and ice, is based on the natural energy sources - solar u0438u0437u043bu0443u0447 u0435u043du0438u0438 and wind.
机译:本发明涉及用于干旱土地灌溉的建筑设施和对抗干旱土地的建筑物,该建筑物涉及用于干旱土地的灌溉的设施和作战手段。全球 u043f u043e u0442 u0435 u043f u043b u0435 u043d u0438 u0435 u043c地球上的气候变化。申报对象的技术结果是在冬季和夏季增强了人工冰川的快速增长,质量和规模的增强。即,山区峡谷中的人工冰川是具有可持续水权的新河的天然来源,可以灌溉数十万公顷的干旱地区,从而极大地改变该地区的环境和人口状况。在山区河流上人工冰川的教育模式包括在海拔2500 m以上建立河流路线海平面 u043d u0438 u0437 u043a u043e u043d u0430 u043f u043e u0440 u043d u043e u0439水坝柱 u043e u044f u043d u043d u043e u0435 u043f u0440 u043e u043c u043e u0440 u0430 u0436 u0438 u0432 u0430 u043d u0438 u0435然后是与上层 u0431 u044c u0435 u0444 u0435相关的水。 u043f u0440 u043e u043c u043e u0440 u0430 u0436 u0438 u0432 u0430 u043d u0438 u0435运动管 u0441 u0432 u0 430 u044f u043c u0438包含冷却元件,通过这些冷却元件, u0441 u0438 u0442 u0435 u043b u044c具有负蛋彩游览。由于冰池的冷却元件的生长来自管状桩,并且有大量的冰块。在河道中,首先是下游的冰盆上方,一段时间之后和下方是新的冷藏管桩块, u0443 u043a u0440 u0435 u043f u043b u044f u044e u0449 u0438冰川下方的土壤并防止其漂移。在这个 u043b u0435 u0434 u043e u0441 u0431 u043e u0440 u043d u044b u0439中,水池本身起着水坝的作用,其高度和厚度在不断增加。当其厚度为80至100米时。全年循环使用的工作装置基于自然能源-太阳能, u0438 u0437 u043b u0443 u0447 u0435 u043d u0438 u0438和风。

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号