首页> 外国专利> DUAL SUBSEA PRODUCTION CHOKES FOR HIGH PRESSURE WELL PRODUCTION

DUAL SUBSEA PRODUCTION CHOKES FOR HIGH PRESSURE WELL PRODUCTION

机译:用于高压井生产的双重地面生产单板

摘要

Configurations and methods for subsea hydrocarbon production at high pressure wells are contemplated in which production control is achieved by implementing two choke valves in series between the wellhead and the riser. The first production choke reduces pressure from well pressure to a reduced pressure, while the second production choke further reduces the pressure from the reduced pressure to riser pressure. The first production choke is preferably coupled to the production tree, and the second production choke is coupled to production tree, a subsea pipeline-end device (e.g., PLET or PLEM), a well jumper, or a flowline jumper.
机译:设想了用于在高压井下生产海底烃的配置和方法,其中通过在井口和立管之间串联设置两个节流阀来实现生产控制。第一生产节流阀将压力从井压降低到减压,而第二生产节流阀将压力从降低的压力降低到立管压力。第一生产扼流圈优选地连接至生产树,而第二生产扼流圈则连接至生产树,海底管线末端装置(例如,PLET或PLEM),井跳线或流线跳线。

著录项

  • 公开/公告号IN280496B

    专利类型

  • 公开/公告日2017-02-24

    原文格式PDF

  • 申请/专利权人

    申请/专利号IN2261/DELNP/2009

  • 发明设计人 MENG WEIHONG;

    申请日2009-04-06

  • 分类号E21B7/12;

  • 国家 IN

  • 入库时间 2022-08-21 13:38:05

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号