首页> 外国专利> Method for measuring the capacity and resistance of interwinding insulation in power transformers

Method for measuring the capacity and resistance of interwinding insulation in power transformers

机译:电力变压器绕组间绝缘容量和电阻的测量方法

摘要

the measurement method with capacity and resistance miu0119dzyzwojowej riz insulation in transformers includes two energy measurements. the first: rezystorem (rr) set value current i0 and measured voltage on the winding of more ub0 consuming (b - 0), and then switch (w2) closes winding powered (b 0) and recorded the dissipation power and (t).the power dissipation and (t) is constant for time tl measurement electromagnetic. second: re fixed value current i0, and subsequently, a switch (w1), excludes current i0 and recorded the voltage u (t) for the winding of more (b 0). the voltage u (t) is read, and the maximum value voltage umax fu under the curve of voltage.from the measured current value i0 and voltage umax and parameters tl and fu is calculated with capacity and resistance riz: (a).
机译:容量和电阻的测量方法包括两个能量测量。第一个:rezystorem(rr)设置电流i0和绕组上消耗更多ub0的实测电压(b-0),然后开关(w2)闭合绕组供电(b 0)并记录耗散功率和(t)。对于时间t1测量电磁,功率耗散和(t)是恒定的。第二个:重新设置电流i0的固定值,然后开关(w1)排除电流i0并记录用于更多绕组(b 0)的电压u(t)。读取电压u(t),并根据测得的电流值i0和电压umax以及参数tl和fu计算电压曲线下的最大值umax fu,并使用容量和电阻riz:(a)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号