首页> 外国专利> Procedure and distribution for the supply of electrical energy from a wind power plant to an alternating voltage network

Procedure and distribution for the supply of electrical energy from a wind power plant to an alternating voltage network

机译:从风力发电厂向交流电网供电的程序和分配

摘要

Procedure for supplying electrical energy to a wind power plant (2,3) through an energy transmission section (8, 9) to an alternating voltage network (11) through a common coupling point (10) of the section transmission system (8, 9) and the alternating voltage network (11), in which * the voltage (Uk) is detected at the coupling point (10) and supplied to a tap selector regulator (16, 17), * the voltage (Us) at the output of the wind power plant (2, 3) is detected and supplied to the tap selector regulator (16, 17) and * depending on the level of the detected voltages (Uk, Us ) by the tap selector regulator (16, 17), in a power transformer (14, 15) arranged in the power transmission section (8, 9) and provided with taps, the taps are occupied in such a way that at the output of the wind power plant (2, 3) a voltage (Us) appears, which leads to a predetermined voltage (Uk) at the common coupling point (10), where * the voltage (Uk) detected a at the coupling point (10) is controlled as to which of several predetermined voltage ranges (Ukmin1-Ukmax1, Ukmin2-Ukmax2, Ukmin3-Ukmax3) it is, and * according to the result of this control by means of a selector of area (34, 38, 41) of several area selectors (34, 38, 41), associated to each voltage range (Ukmin1-Ukmax1, Ukmin2-Ukmax2, Ukmin3-Ukmax3) of the voltage at the coupling point ( 10), for the output voltage (Us) in the wind power plant (2, 3) the tap selector regulator (14, 15) is loaded in such a way that the voltage (Uk) at the output of the wind power plant (2, 3) is in the voltage range (Ukmin1-Ukmax1, Ukmin2-Ukmax2, Ukmin3-Ukmax3) of the respective area selector (34, 38, 41).
机译:通过部分传输系统(8、9)的公共耦合点(10)通过能量传输部分(8、9)向交流网络(11)向风力发电厂(2,3)供应电能的过程)和交流电压网络(11),其中*在耦合点(10)处检测到电压(Uk)并将其提供给分接选择器调节器(16、17),*在输出端的电压(Us)根据分接选择器调节器(16、17)所检测到的电压(Uk,Us)的电平,检测风力发电厂(2、3)并将其提供给分接选择器调节器(16、17)和*,布置在电力传输部分(8、9)中并设有抽头的电力变压器(14、15),抽头被这样占据:在风力发电厂(2、3)的输出处,电压(Us )出现,导致在公共耦合点(10)处产生预定电压(Uk),其中*在耦合点(10)处检测到的电压(Uk)被控制为*通过多个区域选择器的区域选择器(34、38、41)的控制结果,*达到几个预定电压范围(Ukmin1-Ukmax1,Ukmin2-Ukmax2,Ukmin3-Ukmax3)中的哪个(34、38、41)对应于耦合点(10)上电压的每个电压范围(Ukmin1-Ukmax1,Ukmin2-Ukmax2,Ukmin3-Ukmax3),用于风力发电厂(在图2、3中)抽头选择器调节器(14、15)的负载方式应使风力发电厂(2、3)的输出端的电压(Uk)在电压范围(Ukmin1-Ukmax1,Ukmin2-各个区域选择器(34、38、41)的Ukmax2,Ukmin3-Ukmax3)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号