首页>
外国专利>
METHOD OF CONSTRUCTING PRE-SUPPORTED TUNNEL IN MINE FOR COMPLETELY BLOCKING CIRCUMFERENTIAL SURFACE OF TUNNEL FROM WATER
METHOD OF CONSTRUCTING PRE-SUPPORTED TUNNEL IN MINE FOR COMPLETELY BLOCKING CIRCUMFERENTIAL SURFACE OF TUNNEL FROM WATER
展开▼
机译:矿山中全封闭式隧道周向面构造矿山预支隧道的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a method of constructing a pre-supported tunnel in a mine for completely blocking a circumferential surface of a tunnel from water and, more specifically, to a method of constructing a pre-supported tunnel in a mine for completely blocking a circumferential surface of a tunnel from water capable of forming a tunnel by completely blocking a circumferential surface of a tunnel from water by installing a pre-supporting member in the circumferential surface of the tunnel toward the circumferential surface of the tunnel and performing pressure grouting to be fracturing-grouted. The method of constructing a pre-supported tunnel in a mine for completely blocking a circumferential surface of a tunnel from water includes: a step of excavating a pilot tunnel (12) to be smaller than a size of a tunnel (13) in a tunnel excavation line (15); a step of boring a bored hole (18) toward a circumferential surface of the tunnel to pass through the tunnel excavation line (15) in the pilot tunnel (12); a step of inserting a pre-supporting member (14) into the bored hole (18); a step of performing grouting into the bored hole into which the pre-supporting member (14) is inserted by expanding a packer; and a step of fixing the pre-supported member (14) exposed to an excavation surface to a planar structure in the tunnel after the excavation of the tunnel (13).;COPYRIGHT KIPO 2017
展开▼