首页>
外国专利>
Improved technique of railway track ballast operation
Improved technique of railway track ballast operation
展开▼
机译:铁路道ball运行改进技术
展开▼
页面导航
摘要
著录项
相似文献
摘要
The indirect method is disclosed improved operation of the railway track. Roadbed improved method of railway track from station according to the invention, step 1 to the rail track and the vertical to be installed the number Jikji earth to the hypothesis railway track gauge outside a predetermined interval, and install an H-beam in the transverse direction to the number Jikji earth; Step 2 to install the horizontal brace member for supporting one side of the H-beam connected to the rail track and the trajectory correction; Step 3 to demolish the gravel and sleepers were installed in the machine railway tracks; Step 4 Dodge and excavate the roadbed of the railway track; It can display the distance Jikji earth installation position, to install the panel in the lower portion of the rail track and comprises a jyakki to adjust the height of the gauge control apparatus and a rail track for holding the hoenggan distance of the rail track installation the elevator device step 5; Step 6, but that is in step 5 above the train station in the base state unhaengjung train and build places of differential settlement occurs, the alarm transmission system, check the H-beam deformation; Installed on both sides of the dice can cause the outside, and Step 7 and carry out solidarity actions that control the intensity and pressure of the earth above can Jikji, a fine correction of the rail track; After the above step 5 is installed in a protective plastic supporting device, by adjusting the panel performs a fine correction trajectory 8 comprising pouring concrete; is configured to include a. ;
展开▼