TOP-DOWN PILE CONSTRUCTION METHOD USING DETACHABLE BEARING UNIT AND TOP-DOWN CONSTRUCTION METHOD USING SAME
TOP-DOWN PILE CONSTRUCTION METHOD USING DETACHABLE BEARING UNIT AND TOP-DOWN CONSTRUCTION METHOD USING SAME
展开▼
机译:使用可拆卸轴承单元的自下而上桩法和使用相同方法的自下而上法桩
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a top-down pile construction method using a detachable bearing unit, and a top-down construction method using the same. A detachable bearing unit and a large diameter PHC pile supporting a load of a structure and a work load of a basement layer are constructed by being connected in the top-down construction method, and a steel pillar is connected to the PHC pile by being inserted into the detachable bearing unit to conduct excavation construction. As such, the top-down pile construction method using the detachable bearing unit is able to remarkably reduce pile construction costs in a top-down section. According to a desirable embodiment of the present invention, the top-down pile construction method using the detachable bearing unit comprises: (a) a step of boring a bored hole in a predetermined depth; (b) a step of forming a reinforcing plate and embedding the detachable bearing unit which is coupled as a coupling unit of the reinforcing plate is coupled to a connection bolt of the PHC pile of a joint unit into the bored hole; (c) a step of lightly hitting an upper end of the detachable bearing unit, and embedding a front end of the lower PHC pile into a support layer; (d) a step of inserting the steel pillar having a plurality of stud bolds on the outside of a lower part, into a hollow of the bearing unit, and embedding a lower end to the PHC pile of the joint unit; (e) a step of injecting grout into the PHC pile of the joint unit; (f) a step of disassembling the detachable bearing unit from the PHC pile, and drawing out the bearing unit to the outside; and (g) a step of refilling the bored hole with soil.;COPYRIGHT KIPO 2017
展开▼