首页> 外国专利> METHOD FOR EXPANDING THE ROAD DESIGN

METHOD FOR EXPANDING THE ROAD DESIGN

机译:扩大道路设计的方法

摘要

FIELD: construction.SUBSTANCE: method of road construction broadening comprises performing horizontal shear of the curb soil to a depth equal to the thickness of the existing coating along the coating edge by the motor grader, while simultaneously removing it to the embankment slope, cutting with a disk cutter perpendicularly to the coating plane or vertically to this edge to a width of not more than 100 mm, collection of edge wreckage fragments into the front loader bucket for recycling, pressing into the subgrade through the compacted bed course by a self-propelled pile-blowing machine before forming the coating of retrieved metal sheet piles in the form of a vertical "diaphragm wall", closely adjacent to the renewed edge of the coating. The lower pointed ends of the piles are inserted into the active layer of the compacted soil base to a sufficient depth, and the upper ends of the piles with lugs rise above the level of the horizontal bottom of the curb soil shear to a minimum height sufficient to arrange the clamp of the lifting mechanism. Then, soil curb and embankment slope are removed along the diaphragm wall by the motor grader up to the pavement bottom, the active layer of the soil base is made with recommended thickness, to the calculated value of broadening, with multilayer consolidation up to the maximum density at an optimum moisture content and all structural layers of new pavement are made of materials similar to materials of the old pavement by quality, thickness and degree of consolidation, providing lateral support for material of each structural layer by soil bedding onto the curb with simultaneous consolidation of the whole level. Step by step, after consolidation of each pavement layer by the pile-blowing machine, each pile is extracted by an amount equal to the thickness of this layer. After consolidation of the last pavement layer by 50%, all piles are removed completely, afterwards a new coating is placed adjacent to the old coating by plane of edge cutting. On the section of the planned road structure broadening with the curbs along the edge of the reinforcing asphalt-concrete curb lane broken stone bed with a width of at least 1.2 m is removed by a single passage of the self-propelled road harrow to a depth equal to its thickness, while simultaneously loading the unconsolidated material of the layer into the body of dump truck goinh in front of or behind the milling machine for transportation to the designated place. Then, a trench is cut along the edge of the reinforcing curb lane to the level of the top of the sand bed course with a wheel tractor equipped with a Bar saw, shifted to the left of the longitudinal symmetry axis of the machine, with one auger to the right of the saw, a passage in the same direction. A mixture of unconsolidated broken stone of pavement structural layer slopes and curb soil is carried forward and upward, where it is distributed by the Bar auger along the trench bottom formed by the passage of the harrow.EFFECT: providing operational reliability of the given road section by the device of a diaphragm wall guaranteeing safety of the intense-deformed material condition of old road clothes base layers.4 dwg
机译:技术领域:道路施工拓宽的方法包括:通过平地机对路缘土壤进行水平剪切,使其沿着平地机边缘沿剪切边缘的深度达到等于现有覆盖层厚度的深度,同时将其移至路堤边坡,用垂直于涂层平面或垂直于该边缘的圆盘切割机,宽度不超过100 mm,将残骸碎片收集到前装载机铲斗中进行回收,并由自走式压实机通过压实床层压入路基在形成取回的金属薄板桩的涂层之前,以垂直的“隔板壁”的形式,紧挨着涂层的新边缘,使用吹桩机。将桩的下端插入夯实土壤基层的活动层中,直到足够的深度,而带有凸耳的桩的上端则上升至超过路缘土剪切水平底部的水平,直至达到足够的最小高度布置提升机构的夹具。然后,用自动平地机沿隔板壁将路缘石和路堤边坡去除,直至人行道底部,使土壤基层的活动层具有推荐的厚度,达到计算的增宽值,多层固结达到最大最佳含水量下的高密度,并且新路面的所有结构层均由与旧路面材料类似的材料制成,其质量,厚度和固结度均由土壤垫层到路缘上,同时为每个结构层的材料提供侧向支撑巩固整体水平。在通过吹毛机固结每个铺路层之后,逐步地,以等于该层的厚度的量抽出每个桩。在最后一个路面层固结50%之后,所有绒毛都被完全清除,然后通过边缘切割平面将新涂层与旧涂层相邻放置。在计划的道路结构上,通过自行式耙车的单次通过,将宽度至少为1.2 m的碎石床沿加固的沥青混凝土路缘的边缘加宽,从而拓宽了路缘。厚度等于其厚度,同时将层的未固结材料装载到铣刨机之前或之后的自卸车柜体中,以运输到指定位置。然后,用装备有条锯的轮式拖拉机沿着加固路缘的边缘在沙床路线的顶部水平切一条沟渠,将其移至机器的纵向对称轴的左侧,其中一条锯右边的螺旋钻,方向相同。路面结构层斜坡和路缘土的未固结碎石的混合物向前和向上传播,由Bar螺旋钻沿耙的通道形成的沟槽底部分配。效果:提供给定路段的运营可靠性通过隔膜墙装置保证了旧路衣基层强烈变形材料条件的安全性。4 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号