METHOD FOR REMOVING WELLS INTERDRIVING IN GAS COLLECTING FLOWLINES OF HIGH NORTH GAS FIELDS

机译:高北部气田集气流井间干扰的消除方法。

摘要

FIELD: oil and gas industry.;SUBSTANCE: method includes the assignment of its operation modes within the process limits, which are determined by the calculation method, based on the results of gas-hydrodynamic wells researches. At that during the field operation, using the telemetry and automatic process control systems of the complex gas treatment unit (CGTU), measure with the specified quantization step the actual gas pressures at the collector of each well cluster and at the end of the gas collecting flowlines (GCF), and the gas flow of each well cluster, and using the measured data and the passport characteristics of the GCF in the real time scale, calculate the gas pressure at the pumping points and make the time-synchronized graphs of pressure pairs: the measured at the collector's cluster and calculated for the pumping point, to which it is connected and the pressure measured at the end of GCF as well and calculated for the last pumping point before the CGTU, and, as soon as it is found, that one of the pressure difference pairs becomes less than the specified threshold, the value of which is assigned, based on the results of the last gas-hydrodynamic well tests and the CGTU specified operation mode, the CGTU operator is given the report on identifying the problems in the GCF work and/or the corresponding cluster of the gas wells, as well as the recommended list of individual operations sequences of the situation appeared on the problem section correction, and using this list, the operator of the plant takes the final control solution to fix the problem.;EFFECT: determination accuracy increase of the gas collecting flowlines operation mode correct selection with the common collector in the real time scale.;2 dwg
机译:领域:方法:该方法包括在工艺范围内分配其操作模式,该范围是根据计算方法确定的,基于气液动力井的研究结果。在现场操作时,使用复杂气体处理单元(CGTU)的遥测和自动过程控制系统,以指定的量化步骤测量每个井群的集热器和集气结束时的实际气压管线(GCF)和每个井群的气体流量,并使用实时规模的测量数据和GCF的护照特征,计算抽水点处的气压,并制作压力对的时间同步图:在集热器群集处测得的值并计算出与之相连的抽水点,在GCF末端也测得的压力,并计算出CGTU之前的最后一个抽水点,一旦发现,根据最后一次气液动力学试井的结果和CGTU指定的运行模式t,压力差对之一变得小于指定的阈值,并为其指定了值向CGTU操作员提供有关识别GCF工作和/或相应气井群中问题的报告,以及出现在问题部分更正中的情况的建议单个操作顺序列表,并使用此列表,工厂的操作员将采用最终控制解决方案来解决该问题。效果:提高了气体收集流水线操作模式的确定精度,实时选择了使用公共收集器的正确选择。2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号