A COMPUTER-IMPLEMENTED METHOD FOR CONFIGURING A LOAD SHEDDING CONTROLLER
A COMPUTER-IMPLEMENTED METHOD FOR CONFIGURING A LOAD SHEDDING CONTROLLER
展开▼
机译:一种配置负荷分担控制器的计算机实现方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method (CFP) for configuring a load shedding controller (1) adapted to control a micro-grid (100). The method comprises the following steps:- providing a graphic user interface (500) on a computer display (52), said graphic user interface including graphic resources (11, 12, 13, 14, 15) activatable by a user;- providing first graphic resources (11) on said graphic user interface to assist a user in selecting a load shedding procedure (LSP) to be executed by said load shedding controller, when said micro-grid is disconnected from said main grid;- providing second graphic resources (12) on said graphic user interface to assist a user in listing the electric loads (L1, ..., LN) included in said micro-grid;- providing third graphic resources (13) on said graphic user interface to assist a user in providing first configuration values (CF1) to configure grid operating parameters processed during the execution of the selected load shedding procedure by said load shedding controller;- providing fourth graphic resources (14) on said graphic user interface to assist a user in providing second configuration values (CF2) to configure load operating parameters processed during the execution of the selected load shedding procedure by said load shedding controller;- checking whether said load shedding controller (2) meets minimum operating requirements to operate;- if said load shedding controller meets said minimum operating requirements, transmitting configuration information including at least said first and second configuration values (CF1, CF2) to said load shedding controller.
展开▼
机译:一种用于配置适于控制微电网(100)的减载控制器(1)的方法(CFP)。该方法包括以下步骤:-在计算机显示器(52)上提供图形用户界面(500),所述图形用户界面包括可由用户激活的图形资源(11、12、13、14、15);-当所述微电网与所述主电网断开连接时,在所述图形用户界面上提供第一图形资源(11)以帮助用户选择将由所述减负荷控制器执行的减负荷程序(LSP);-在所述图形用户界面上提供第二图形资源(12),以帮助用户列出包括在所述图形用户界面中的电负载(L 1 Sub>,...,L N Sub>)微电网-在所述图形用户界面上提供第三图形资源(13),以帮助用户提供第一配置值(CF1),以配置在由所述减负荷控制器执行所选减负荷程序期间处理的网格操作参数;-在所述图形用户界面上提供第四图形资源(14),以帮助用户提供第二配置值(CF2),以配置在由所述减载控制器执行所选减载程序期间处理的负载操作参数;-检查所述减载控制器(2)是否满足操作的最低操作要求;-如果所述减载控制器满足所述最小操作要求,则将至少包括所述第一和第二配置值(CF1,CF2)的配置信息发送到所述减载控制器。
展开▼