首页> 外国专利> Construction method and construction support system of static press-in compaction method

Construction method and construction support system of static press-in compaction method

机译:静压压实法的施工方法及施工支撑系统

摘要

PROBLEM TO BE SOLVED: To prevent a rod from jamming after injection of one day is completed and to speedily start injection work on next and succeeding days when it is necessary to inject an improvement material for several days by a static press-in compaction technique.SOLUTION: In a drilling process, drilling is so performed that a hole wall becomes larger than a rod diameter, and in a following injection process, an improvement material is injected into the soil through a rod 12 so that the improvement material is push back into a gap 4 between a rod periphery and the hole wall. After injection of one day is completed, a washing instrument 14 is pressed in the rod to wash away the inside of the rod with hydraulic pressure, and the rod is rotated for edge cutting between the improvement material to be solidified with time and the rod. The rotation of the rod is started within several hours after the injection of the day is completed, and the rod is rotated for several minutes, for example, at intervals of several hours after the initial rotation is started. The rod is thus rotated to perform the edge cutting with the improvement material having been injected, so that a failure in recovering the rod due to jamming can be prevented.SELECTED DRAWING: Figure 5B
机译:解决的问题:为了防止杆在一天的注射完成后卡住,并在接下来的几天及以后的几天迅速开始注射工作,需要通过静态压入压实技术将改进的材料注射几天。解决方案:在钻孔过程中,进行钻孔的目的是使孔壁大于杆的直径,并且在随后的注入过程中,将改良材料通过杆12注入土壤中,以便将改良材料推回土壤中。杆周边和孔壁之间的间隙4。在一天的注射完成之后,将清洗仪器14压入棒中以用液压压力冲洗掉棒的内部,并且旋转棒以在要固化的改进材料和棒之间进行边缘切割。在一天的注射完成后的几个小时内,杆的旋转开始,并且杆开始旋转几分钟,例如,在初始旋转开始后的几个小时的间隔内。因此,旋转杆以在注入改进材料的情况下进行边缘切割,从而可以防止由于卡住而导致杆恢复失败。选定的图:图5B

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号