CONSTRUCTION METHOD OF BASE STRUCTURE, AND BASE STRUCTURE

机译:基础结构的构造方法和基础结构

摘要

PROBLEM TO BE SOLVED: To provide a rational construction method of a base structure and the base structure that enable a bottom slab constructed by a cement press-in construction method to be used as a base structure body when the base structure is constructed by applying the cement press-in construction method to a temporary earth retaining work, at the same time curtailing the construction period and reducing a construction cost.;SOLUTION: A construction method of a base structure includes the following steps for: constructing a vertical pit 10 in a ground as a temporary earth retaining structure by repeating steps for pressing-in a ring-form segment 12 into a ground G, excavating the ground G inside the segment 12 that has been pressed in and discharging the soil, and then adding the ring-form segment 12 on top of the existing segment 12; installing a reinforcement cage 14 assembled on the ground by lowering to a bottom part 16 of the vertical pit 10 that has been constructed; and casting concrete 28 such that to bury the reinforcement cage 14 that has been installed on the bottom part 16 of the vertical pit 10.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2018,JPO&INPIT
机译:解决的问题:提供一种合理的基础结构施工方法和基础结构,使得在通过应用混凝土压入法构造基础结构时,能够将通过水泥压入施工方法构造的底板用作基础结构主体。水泥压入法施工到临时的土方工程中,同时缩短了施工周期并降低了施工成本。解决方案:基础结构的施工方法包括以下步骤:在地下室中建造竖井10通过重复以下步骤将地面作为临时的挡土结构:将环形部分12压入地面G中,在已压入的部分12中挖掘地面G并排出土壤,然后添加环形在现有细分12之上的细分12;通过降低到已建造的竖井10的底部16来安装组装在地面上的加强笼14;浇铸混凝土28,以便掩埋已安装在竖井10底部16上的钢筋笼14;选图:图1;版权:(C)2018,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号