首页> 外国专利> Combined cycle gas turbine plant comprising a waste heat steam generator and fuel preheating step

Combined cycle gas turbine plant comprising a waste heat steam generator and fuel preheating step

机译:包括余热蒸汽发生器和燃料预热步骤的联合循环燃气轮机设备

摘要

A combined cycle gas turbine plant and a corresponding method for operating such a combined cycle gas turbine plant, in which, during load operation of the combined cycle gas turbine plant, a water mass flow which is supplied according to the forced-flow principle to a waste heat steam generator is adjusted such that the evaporator heating surface of the medium pressure stage is oversupplied and thus a defined amount of excess water, which is heated in the evaporator heating surface but not vaporized, is discharged via the water-steam separator to a heat exchanger circuit for preheating fuel for the gas turbine.
机译:联合循环燃气轮机设备以及用于操作这种联合循环燃气轮机设备的相应方法,其中,在联合循环燃气轮机设备的负载运行期间,根据强制流动原理将水质量流量供应给调节余热蒸汽发生器,以使中压级的蒸发器加热表面供过于求,因此,在蒸发器加热表面中被加热但未被蒸发的一定量的多余水通过水蒸汽分离器排放到用于预热燃气轮机燃料的热交换器回路。

著录项

  • 公开/公告号US10100680B2

    专利类型

  • 公开/公告日2018-10-16

    原文格式PDF

  • 申请/专利权人 SIEMENS AKTIENGESELLSCHAFT;

    申请/专利号US201415021530

  • 发明设计人 JAN BRÜCKNER;FRANK THOMAS;

    申请日2014-08-21

  • 分类号F01K23/10;F22B1/18;F22B29/06;F02C7/224;

  • 国家 US

  • 入库时间 2022-08-21 13:06:20

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号