首页> 外国专利> Systems and Methods for Producing Gas Wells with Multiple Production Tubing Strings

Systems and Methods for Producing Gas Wells with Multiple Production Tubing Strings

机译:用多个生产管柱生产气井的系统和方法

摘要

A system for producing hydrocarbons from a subterranean well including a wellbore extending from a surface into a subterranean formation includes a wellhead disposed at the surface. In addition, the system includes a production tree coupled to the wellhead and a casing coupled to the wellhead and extending into the wellbore. Still further, the system includes a first production tubing string extending into the casing from the wellhead to a first production zone and a second production tubing string extending into the casing from the wellhead to the first production zone. The first production tubing string and the second production tubing string are each configured to provide a fluid flow path for gases from the first production zone. The second production tubing string is radially spaced from the first production tubing string. The first production tubing string has an inner diameter D1 that is larger than an inner diameter D2 of the second production tubing string.
机译:一种用于从地下井生产碳氢化合物的系统,该系统包括从表面延伸到地下地层的井眼,该系统包括布置在该表面处的井口。另外,该系统包括连接到井口的采油树和连接到井口并延伸到井眼中的套管。更进一步,该系统包括从井口延伸到第一生产区的套管中的第一生产管柱和从井口延伸到第一生产区的套管中的第二生产管柱。第一生产油管柱和第二生产油管柱均构造成为来自第一生产区的气体提供流体流动路径。第二生产油管柱与第一生产油管柱在径向上间隔开。第一生产油管柱的内径D 1 大于第二生产油管柱的内径D 2

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号